​The construction works on first stage of thoroughfares of Belgrade Waterfront project

The construction works on first stage of thoroughfares of Belgrade Waterfront project encompass all required infrastructure for facilities being constructed as part of this project.

The construction works on first stage of thoroughfares of Belgrade Waterfront project encompass all required infrastructure for facilities being constructed as part of this project.

The requirements of the investors and expectations of future residents of Belgrade Waterfront are very high both from aspect of functionality and quality of conducted works and installed materials. The Spatial plan prescribes regulatory lines of communications and routing of complete infrastructure currently constructed such as waterworks, atmospheric and faecal sewerage, heating pipe line, gas pipe line, electric and telecommunication equipment as well as irrigation system equipment. The works on thoroughfares (in total length of 1600 meters with all traffic and bicycle lanes) encompass a certain number of parking lots, bicycle lanes on boulevards and bicycle lanes as part of thoroughfares, pedestrian lanes (pavements) as well as green area surfaces.

The above-mentioned surfaces are accompanied by adequate drainage, with installation of separators before inflow of atmospheric waters into a collector.

All of carrying parts of thoroughfare structure and asphalt lairs (bituminous base and reinforced concrete) are made in accordance with regulations with continuous control of load power of each of manufactured layer. The final processing of all pedestrian lanes and parking lots involves use of granite panels of dimension and colour according designers choice. Public and decorative lighting of modern shape and high quality with led lights and optional control and regulating of light intensity shall be mounted. The beautification of the overall area shall be done with selected breeds of nurtured seedlings from prestigious European and domestic nursery gardens with a long established tradition in production of seeding material. The project prescribes mounting of irrigation system for maintenance of green areas that uses ground water through a specially designed well.

All pedestrian lanes will be equipped with a specially designed urban mobilier made of benches, waste selection disposal cans as well as cans for disposal of K-9 waste coupled with disposable bags.