Mounting of piles on Belgrade Waterfront construction site

Preparatory works on Plot14

The preparatory survey works have been carried out ahead of preparatory works on Plot 14 in form of geodetic survey and clearing up of terrain. The mounting of 482.5 meters long fencing. The excavation of 3rd and 4th category soil with loading and transport of 38,250 m3.The survey drills pi 160 mm - 13,810.5 meters were dug out as part of preparatory works. Larsen planks 691.2 m2 have been mounted. The ground water levels were lowered with use of 350/225 mm wells equipped with an appropriate pumping aggregate, discharge pipe line, command cabinet and automatics .