Belgrade Waterfront – Sava promenade

Project “SAVA PROMENADE” is divided into three units: 1. COASTAL ZONE  - Repair and reconstruction of the revetment 2. HERCEGOVAČKA STREET ZONE  - Reconstruction of the street 3. PROMENADE ZONE – The construction of promenade

Project “SAVA PROMENADE” is divided into three units:

1. COASTAL ZONE  - Repair and reconstruction of the revetment 2. HERCEGOVAČKA STREET ZONE  - Reconstruction of the street 3. PROMENADE ZONE – The construction of promenade

Belgrade Waterfront – SAVA PROMENADE

Construction period: 2015 - 2016.

“SAVA PROMENADE” project is divided into three units:

1. COASTAL ZONE – Repair and reconstruction of the revetment

2. HERCEGOVAČKA STREET ZONE – Reconstruction of the street

3. PROMENADE ZONE – The construction of promenade

COASTAL ZONE

Repair and reconstruction of the revetment comprises works by which the new quay level on the right coast of the Sava is established, covering around 250m in length, the so-called Sava Promenade zone “Belgrade waterfront”, from the old Sava bridge (km 1+525 of river chainage), to downstream zone limit (km 1+275).

The coastal belt arrangement includes:

•          Construction of embankments and raising the level of the revetment – promenade and bicycle path to the level 76.00, and level 75.50 in front of the existing pavilion buildings

•          Construction of a terrace in front of the pavilion in two levels

•          Construction of an access staircase to a pontoon

•          Construction of the pontoon platform in the extension of the promenade

•          Construction of an amphitheater under the bridge

•          Construction of a picnic zone next to the promenade

•          Handling of pedestrian and road transport

•          Greening

•          Equipping with urban mobiler

•          Construction of street and decorative lighting

•          Installing security fences

•          Setting up marking and directional boards – road signs

HERCEGOVAČKA STREET ZONE

The arrangement of Hercegovačka street in the framework of Sava promenade Belgrade Waterfront project. The area encompasses Hercegovačka street itself, parking lot along the Hercegovačka street as well as connected roads to the existing level crossing which is being reconstructed in accordance with project documentation.

As part of this unit the following has been performed:

•          Arrangement of park in Travnička street

•          Reconstruction of the existing roadway with the correction of the substrate

•          Construction of a new surfacing on the part of level crossing

•          Construction of a parking lot

•          Paving the sidewalk and setting the curb

•          Regulation of drainage with reconstruction / construction of drains

•          Greening

•          Lighting

•          Equipping with the urban mobiler

•          Horizontal and vertical signaling

•          Installation of billboards and directional road signs

PROMENADE ZONE

The construction of Promenade within Sava Promenade “Belgrade Waterfront” zone. Pedestrian promenade connects the facility of the gallery (Geozavod) with the promenade on the coast. The area also includes Mostarska street, defined as a pedestrian walkway.

As part of this unit the following has been performed:

•           Handling of pedestrian and road transport

•          Regulation of drainage with reconstruction / construction of drains

•          Greening

•          Construction of street and decorative lighting

•          Equipping with the urban mobiler

•          Installation of decorative gates and fences

•          Setting up marking and directional boards – road signs

•          Horizontal and vertical traffic signaling

•          Installation of marketing and interactive billboards